Borrar filtros
Borrar filtros

Import elements of an array from workspace

2 visualizaciones (últimos 30 días)
Islam Elnady
Islam Elnady el 22 de En. de 2018
Comentada: Islam Elnady el 25 de En. de 2018
Hi, I've created this model in Simulink to import elements of an array of waypoints (x,y) from workspace on a sequential basis so that a Robot can follow them, point after point.
The index selectors switch to the next index by increasing the data store memory variable "A" by "1" when the Robot reaches the current waypoint within 100 m.
When I run the model the variable "A" jumps to the final value (16 in this case) at the first sample time of simulation. why? any help?
Below is the matlab function block:
function y = fcn(u,n)
global A;
if u<100 && A<n
A = A+1;
end
if A>n
A=n;
end
y = A;
end

Respuestas (1)

Manuel
Manuel el 23 de En. de 2018
Have you already tried using a LookUp table?
regards mscharff

Categorías

Más información sobre Event Functions en Help Center y File Exchange.

Productos

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by