Problem with Simulink Model

7 visualizaciones (últimos 30 días)
Alexander Giles
Alexander Giles el 3 de Jul. de 2013
Respondida: Joel Van Sickel el 1 de Dic. de 2020
Hello,
I am currently investigating the behaviour of a distributed generator following an islanding event (loss-of-mains). I have an ideal source, which represents the generation from the rest of my power system; then I have a very simple distribution network with some loads and a single synchronous generator. I apply an islanding event at t = 15s. The load exceeds the generation so I expect the frequency to fall. I am measuring this using the 'm' output from the simplified synchronous machine block and comparing it with the frequency measurement from the PLL block. However, the two show different behaviour. Furthermore, following the islanding event, the power output of the synchronous machine increases. I don't understand what is going on with my model. Please could someone shed some light.
Thanks,
Alex
  1 comentario
Phani
Phani el 30 de Sept. de 2013
Editada: Phani el 30 de Sept. de 2013
Hello Alexander,
Fortunately I'm working on the same project. Glad to see another person working on the same =) I've designed a DG source (Micro Turbine Generator) for connecting it to utility grid. Then I wanted to check the rate of change of freq/voltage with DG end and Point of common coupling. From what you have said, your DG is supposed to fail supplying adequate power to loads in islanding condition. So the freq will drops and the only thing I didn't understand is, how could the power output of your sync gen increases with loss of mains? Could you elaborate your problem. May be we could discuss together and continue our project.
Regards,
Raghav.

Iniciar sesión para comentar.

Respuestas (1)

Joel Van Sickel
Joel Van Sickel el 1 de Dic. de 2020
Copying answer from comments: Question askwer did not respond to request for additional information:
Hello Alexander,
Fortunately I'm working on the same project. Glad to see another person working on the same =) I've designed a DG source (Micro Turbine Generator) for connecting it to utility grid. Then I wanted to check the rate of change of freq/voltage with DG end and Point of common coupling. From what you have said, your DG is supposed to fail supplying adequate power to loads in islanding condition. So the freq will drops and the only thing I didn't understand is, how could the power output of your sync gen increases with loss of mains? Could you elaborate your problem. May be we could discuss together and continue our project.
Regards,
Raghav.
This answer is part of a MATLAB Answers cleanup effort for unanswered questions that are outstanding.

Categorías

Más información sobre Electrical Sensors en Help Center y File Exchange.

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by