photo

Mohamud Abdi


Electrical Department

Con actividad desde 2015

Followers: 0   Following: 0

Mensaje

Currently enrolled in Electrical Engineering Student at Dal.

Estadística

Feeds

Ver por

Pregunta


I am expecting to get 64 peaks (Sinc) within a range of 100MHz, but unfortunately, I can only see one peak in the said interval... Can anyone tell me what I am doing wrong in this code. If there is a better way of doing this task, let me know. Thanks
N=1024; fs=100*10^6; T=1/fs; vec=zeros(N,1); positions=[64 128 192 256 320 384 448 512 576 640 704 768 832 896 960 1024]; ...

más de 9 años hace | 0 respuestas | 0

0

respuestas

Pregunta


I was wondering if there is anyone who would like to help me Plotting FFT using my code. I have done enough work on it, but I am not getting the result I was expecting and at this point, I have no clue what I am doing wrong.
Hello friends. I need help with this Matlab code. In the code, I have a value of Cn, which is just a bunch zeros and ones (N=...

más de 9 años hace | 1 respuesta | 0

1

respuesta