can we control Data Inspector from command line ?

3 visualizaciones (últimos 30 días)
Ajay Pherwani
Ajay Pherwani el 9 de Oct. de 2014
Respondida: Frank Zhou el 15 de Mayo de 2019
I am using Data logger in 2013 with one of my model.
After configuring the signals to log , I run a script which simulates my model several times ( I give simulation start and stop commands in the script)
Once do that, I can see too many runs in the data inspector.
I can delete the these runs using command line simulink.sdi.deleterun but is it possible to prevent the run from being captured by Data Inspector ? rather than deleting it later ?

Respuestas (2)

Astik Sachan
Astik Sachan el 12 de Abr. de 2017

Frank Zhou
Frank Zhou el 15 de Mayo de 2019

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by