Manipulate requirements verfied status ?!

1 visualización (últimos 30 días)
youjarr
youjarr el 3 de Mzo. de 2022
Respondida: Paul Urban el 22 de Abr. de 2022
Hello guys,
is it possible to set the verfied status of an requirement to "passed" without using the Simulink Test Manager?
Because it could be possible that I tested a requirements externally but I want to keep the tracebility within my requirements editor?!
For some requirements I don´t want to use the test manager.
Thanks in advance.
Best regards. 😬👍

Respuestas (1)

Paul Urban
Paul Urban el 22 de Abr. de 2022
There is an example here on how to link results from an external source