Is it necessary to perform a load flow prior to run the power_3levelVSC file?
1 visualización (últimos 30 días)
Mostrar comentarios más antiguos
Juan Antonio Cabeza López de Tamayo
el 7 de Jun. de 2020
Comentada: Juan Antonio Cabeza López de Tamayo
el 13 de Jun. de 2020
Good afternoon, in this file a PWM converter is connected to a grid. My question is whether it is necessary or not to perform a load flow before simulating this file.
If not could you please suggest other cases where a previous load flow is required to set the values of the blocks? Thanks in advance!
Juan Cabeza
jaca1810eng@gmail.com
Research Gate: Juan Cabeza
Twitter: @jaca1810eng
0 comentarios
Respuesta aceptada
Joel Van Sickel
el 8 de Jun. de 2020
Hello Juan,
due to the power electronics involved and how they are modelled in this model, the load flow option would not work. Instead, this model was run to steady state, and those states were saved and then put in as initial conditions.
Here are some models that use load flow. Unfortunately, if your main goal is the power electronics simulation, this type of work flow won't be useful for you.
Regards,
Joel
1 comentario
Más respuestas (0)
Comunidades de usuarios
Más respuestas en Power Electronics Control
Ver también
Categorías
Más información sobre Power and Energy Systems en Help Center y File Exchange.
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!