Borrar filtros
Borrar filtros

Info

La pregunta está cerrada. Vuélvala a abrir para editarla o responderla.

How can I improve my SA algorithm that I used for job scheduling?

2 visualizaciones (últimos 30 días)
snr matlb
snr matlb el 9 de Jun. de 2020
Cerrada: MATLAB Answer Bot el 20 de Ag. de 2021
objective: max sum(solution(i,9))
------------------------------------------
while T>Tmin
for iteration=100
for i=1:61
function(generate_possible_solutions)
random_value = generate random value
solution(i) = generate_possible_solution(random_value, :)
feasible = sum(solution(i, 9))
next
SA:
check feasible
if feasible > previous_feasible
update best
else
check acceptance function
end
if iteration == limit
update (T)
end
end For
end While
Code is above.
I have a problem with job scheduling. My heuristic algorithm uses possible_solution matrix to allocate each job to a line. For example, 6th job has 140 different options, 7th has 30 different options in the possible_solution matrix.
In simulated annealing, in each iteration, I use one of the solution line into the possible_solution matrix randomly. However, the solution reaches 50% at most when it is compared to GAMS/Cplex solver.
May I use the random selection from solution matrix to use Simulated Annealing? and what I have missed?
Thanks and stay safe,

Respuestas (0)

La pregunta está cerrada.

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by