Borrar filtros
Borrar filtros

Job Sequence Dependent Set-up times

1 visualización (últimos 30 días)
Sander van den Heuvel
Sander van den Heuvel el 16 de Oct. de 2020
I am currently working on modeling a manufacturing system where the set-up types are job sequence dependent. This means that the required set-up time depends on the type of order (entity) previously processed on the server. Specifically, I would like to know how I can store the entity type that was previously processed, compare this to the entity arriving at the server and assign a required set up time to the system. What I would like to achieve is the following: type 1 arrives and sees that a type 2 has been previously processed refers to a matrix or code block and sees that a 3 hour set up time is required to switch from type 2 to 1. Alternatively, when a type 1 arrives and sees that a type 1 has been processed before a set up of only 30 minutes is required. Does someone have an idea how this problem can be addressed in SimEvents or Simulink?
Thank you,

Respuestas (0)

Categorías

Más información sobre Discrete-Event Simulation en Help Center y File Exchange.

Etiquetas

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by