What's wrong whith my schedule ?
1 visualización (últimos 30 días)
Mostrar comentarios más antiguos
clear all;
close all;
clc;
E=0;
while E~=0,2
Io=45.4746;
I=(2*Io)+4;
E=(I-Io)/Io;
G=(Io+E);
Io=G;
end
0 comentarios
Respuestas (1)
Les Beckham
el 23 de Abr. de 2021
There are several things wrong with this code.
First
while E~=0,2
is not valid Matlab syntax. Replace the , with a . if you mean to test for 0.2 (i.e., 1/5).
Second, you are resetting Io at the beginning of each loop so you will get the same results on every pass through the loop. Move the line
Io=45.4746;
above the while loop.
Third, this algorithm (if you move the initialization of Io outside the loop), converges to 1.0 and will never reach 0.2. So, you have an infinite loop.
0 comentarios
Ver también
Categorías
Más información sobre Logical en Help Center y File Exchange.
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!